VIEW CASE STUDIES

Industrial and logistics
Analyzed area
Terrain Typology
Project type
Deciding between demolishing and building from scratch or remodeling the existing industrial warehouse, with the land registered as a low book-value fixed asset.
Executive summary final (Sept. 2023): new construction (investment $2.0–3.6M, gross margin $1.3–1.7M) vs. remodeling (investment $1.17–1.72M, margin $948K–1.11M).

Industrial and logistics
Analyzed area
Terrain Typology
Project type
The mandate changed radically during the study: it went from 'building our own winery' to 'selling the land with a preliminary draft to an investor'.
Final presentation (Mar. 2025): cost $3.5M, sales revenue $3.97M, gross margin 27%, monthly rent $29,207, rental IRR 14.5%.
Capital Perspective · HBU and structuring · 2024 – 2026