Preliminary project for a residential gated community in the western zone of the country

Preliminary project for a residential gated community in the western zone of the country

Vertical and horizontal residential

2,772.03 m²

2,772.03 m²

Analyzed area

Urban, Colonia Aida, Sonsonate

Urban, Colonia Aida, Sonsonate

Terrain Typology

Residential condominium of 10 single-family homes

Residential condominium of 10 single-family homes

Project type

THE CHALLENGE

THE CHALLENGE

To accurately cost a small-scale development to equitably split the profits among three parties.

HBU VALUE ADDED

HBU VALUE ADDED

Final cost document: total project cost $4.15M, sales value $5.39M, net profit $1.15M split equally, plus a $90,000 bonus for the salesperson.

Draft project for the analysis of the conversion of residential and entertainment typologies in the coastal-marine zone of the country

Draft project for the analysis of the conversion of residential and entertainment typologies in the coastal-marine zone of the country

Vertical and horizontal residential

1,217,384 sq m

1,217,384 sq m

analyzed in 4 portions (≈174 apples)

Already developed golf residential (Phase 1)

+ future use lands with complementary vocations

Already developed golf residential (Phase 1)

+ future use lands with complementary vocations

Terrain Typology

Multi-serving Business Case Development

Multi-serving Business Case Development

Project type

THE CHALLENGE

THE CHALLENGE

The historical absorption of existing inventory predicted 40 years to liquidate; it was necessary to diversify typologies and densify without losing brand exclusivity.

HBU VALUE ADDED

HBU VALUE ADDED

Business Case Development final (Mar. 2019): total cost $392.61M, revenue $459.51M, gross margin $66.90M (15%) — reduced the projected payback period from 40 years to 14–17 years.

Draft project for the paracentral coastal marine zone

Draft project for the paracentral coastal marine zone

Vertical and horizontal residential

34 blocks

(Costa del Sol) +

240 blocks (Huizúcar)

34 manzanas

(Costa del Sol) +

240 manzanas (Huizúcar)

analyzed in 4 portions (≈174 apples)

Coastal land

(estuary)+

agricultural land

(94% agricultural / 6% urban)

Coastal land

(estuary)+

agricultural land

(94% agricultural / 6% urban)

Terrain Typology

Business and governance structure for the monetization of two properties

Business and governance structure for the monetization of two properties

Project type

THE CHALLENGE

THE CHALLENGE

The three brother-owners lacked the liquidity to finance feasibility studies and venture capital, and the Huizúcar property was practically undevelopable due to its land-use zoning.

HBU VALUE ADDED

HBU VALUE ADDED

Structured waterfall monetization plan: sell 3 blocks of Costa del Sol (~$1M) to finance the studies and the land-use change process in Huizúcar.

Draft project for a Residential District with a commercial front in the western zone of the country

Draft project for a Residential District with a commercial front in the western zone of the country

Vertical and horizontal residential

182,677 m² of buildable construction

182,677 m² of buildable construction

analyzed over 100.6 manzanas of land (1,005,445 v², 67% useful area)

Agricultural land

(sugarcane and coffee processing plant), classified as developable

Agricultural land

(sugarcane and coffee processing plant), classified as developable

Terrain Typology

Highest and best use portfolio

Highest and best use portfolio

Project type

THE CHALLENGE

THE CHALLENGE

The family, having no experience in real estate development, had to decide on the best mix of uses for a plot of land with hydrological constraints that ruled out 3 of 5 design iterations.

HBU VALUE ADDED

HBU VALUE ADDED

Final presentation (Oct. 2021): total project cost $169.44M, land IRR 13.6%, vehicle IRR (SPV) 59.9%, accumulated net profit 2022–2034 of $9.94M.

Draft value engineering proposal for the Residential Tower in Surf City

Draft value engineering proposal for the Residential Tower in Surf City

Vertical and horizontal residential

34,571.55 sq m

34,571.55 sq m

(2 towers of 17 levels, 136 apartments)

Agricultural/forestry land

according to MARN, with partial plans for medium/high density housing

Agricultural/forestry land

according to MARN, with partial plans for medium/high density housing

Terrain Typology

Peer Review of 2 apartment towers already designed by the client

Peer Review of 2 apartment towers already designed by the client

Project type

THE CHALLENGE

THE CHALLENGE

The client already had their own conceptual design; the task was to audit and optimize that design instead of starting from scratch.

HBU VALUE ADDED

HBU VALUE ADDED

Final presentation (Feb. 2024): the review revealed that the project would cost $42.9M, not the $26.5M originally estimated by the client.

We already validated what to build. Now let's do it right. Get to know Alto Rendimiento.

We already validated what to build. Now let's do it right. Get to know Alto Rendimiento.

MEET ALTO RENDIMIENTO

Capital Perspective · HBU and structuring · 2024 – 2026

DO THE RIGHT PROJECT, DO YOUR PROJECT RIGHT

DO THE RIGHT PROJECT, DO YOUR PROJECT RIGHT

CORPORATE STRUCTURE

Two sister firms. One complete decision chain: from validating value to delivering built capital.

PERSPECTIVA CAPITAL

HBU Analysis
Market Intelligence
Case Studies
Contact

ALTO RENDIMIENTO

PMO Services
Project Record
Methodology
Contact